Jump to content
TUFLOW Forum
Sign in to follow this  
osaillof

Tilting weir

Recommended Posts

Hello TUFLOW community,

I am trying to model a tilting weir using the latest version of ESTRY-TUFLOW... with a series of operation rules enabling the weir to raise by intervals of 100mm every time the 1D flow downstream is reaching a specific value.  Has anyone got any examples on how to represent this structure?

Kind regards,

Oli

Share this post


Link to post
Share on other sites

Further to my post above, I have found examples of 1D network files and operation rule that seem to approximate the operation of the above tilting weir (based on a set water level not flow downstream).

A culvert with vertical overflow gate (using the NAIR 2003 method) OR a gated spillway (using the USACE 111-21 method).

See examples attached. 

Could anyone recommend the appropriateness of each method in relation to the aforementioned tilting weir?

Thanks,

Oli Saillofest

 

TiltingWeirAttempts.zip

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

×
×
  • Create New...